Track Replacements at the following campuses:
Adolfo Camarillo High School
Hueneme High School
Oxnard High School
Pacificia High School
Complete removal of existing latex track system down to substrate. Inspect the existing asphalt for structural integrity before installing new track surface. Repair and patch of substrate to receive new track system. Installation of new Polyurethane track surfacing – Beynon BSS 300 Running synthetic track system – color blue. Apply all associated track line striping per CA & NFHS standards on the track oval (lane event markings and lettering). Additional field event work performed at this site was done independent of the track resurfacing as separate project.