The New Gym is a 39,051 SF CMU block structure built in the 1970’s. The mechanical equipment, locker rooms, restrooms, training rooms, and roof were in need of modernization. We took the existing layout and made minor modifications to open up some space for a new training room to be […]
Lakewood Regional Medical Center – CT Equipment Change Out
Equipment replacement at the Main Hospital Building #1 at Lakewood Regional Medical Center. Replacement of the current CT scanner and supporting equipment in the Scan Room and adjacent Control Room. Associated work included the addition of new mechanical equipment and modification to the existing electrical systems serving this area of […]
Oxnard Union High School District Track Replacements
Track Replacements at the following campuses: Adolfo Camarillo High School Hueneme High School Oxnard High School Pacificia High School Complete removal of existing latex track system down to substrate. Inspect the existing asphalt for structural integrity before installing new track surface. Repair and patch of substrate to receive new track […]
Queen of the Valley Hospital – Postpartum Women’s Center Addition
The 9,000 square foot addition and complete remodel of the existing Maternity Unit includes a 10-bed mother/baby unit, negative pressure isolation rooms, Nursery, Labor Delivery Recovery Unit, Neonatal Intensive Care Unit, and out patient services. The expansion is designed to offer comfort and convenience for moms and babies, providing much-needed […]
St. Joseph Hospital – Starbucks Cafe
For years the hospital campus coffee stand was located outside near the parking garage in a tent like structure. This coffee stand was independently owned and operated by an outside source. The hospital saw an opportunity to expand their retail and capture those sales by installing a Starbucks store within their building and operated by […]
Cal Poly Choral Rehearsal Room 218
California Polytechnic State University, San Luis Obispo, Choir Rehearsal Room had been virtually untouched since its original construction in 1959. The project design implemented cost-effective solutions to upgrade wall and ceiling finishes, while incorporating absorptive and reflective acoustical devices to improve acoustic performance of the space. At the front of […]
University of California, Santa Barbara – El Centro Building
Monte Vista Elementary School Library
New Construction In June 2010, the Hope School District passed an $8 Million local bond measure to fund solar photovoltaic projects at each of their campuses, a new library at Monte Vista Elementary School and Multipurpose Room modernization and expansion at Vieja Valley Elementary School. 19six and the District developed […]
Ocean View Junior High Track & Field
19six Architects designed a new running track and soccer field for Ocean View Junior High School in Oxnard, California. The natural turf field is sized to maximize the available space on the site and includes a new below grade drainage system. The running track has an asphalt base with rubberized […]
Visiting Nurse & Hospice Care – Serenity House
New Construction. Visiting Nurse and Hospice Care’s 18-bed Serenity House is an inpatient hospice house that provides care for hospital patients whose needs cannot be met at home. Hidden on a hillside among Santa Barbara’s majestic coastal oaks, Serenity House was designed to be a place of comfort and dignity […]









